Silvi

CI RenewablesProject: Silvi
System Size: 3.065 MW

System Type: Post driven ground mounted
Interconnection: Net-metered with JCP&L
Location: Belle Mead, NJ

The project achieved commercial operations in October 2016. It was fully financed by CI Renewables (formerly known as KDC Solar) GRQ LLC with Silvi purchasing the kilowatt hour output of the facility under a Power Purchase Agreement. The land that the facility was built on is owned by Silvi and CI Renewables GRQ had a lease agreement with the owner. The project was built with the help of Legacy7 Inc.

 

Silvi

Operational Vitals

Location: Belle Mead, NJ

Client: Silvi

Contractor: Legacy7, Inc.

Acres - Facility Size

MW - Solar System Size

Million kWh/Yr. Est. System Output

CI Renewables