Ardagh Group
Project: Ardagh Group
System Size: 5.5 MW
System Type: Post driven ground mounted
Interconnection: Net-metered with ACE
Location: Bridgeton, NJ
The project achieved commercial operations in July 2019 and consists of 2 ground arrays totaling 5.5 MW connected by a 1,500 LF directional drill. The project was fully financed by KDC Solar ASGM LLC and was built with the help of The Whiting-Turner Contracting Company.
Ardagh Group
Operational Vitals
Location: Bridgeton, NJ
Client: Ardagh Glass
Contractor: The Whiting-Turner Contracting Company